Designed to load 2-3 CNC’s and/or secondary operations within an integrated cell for heavier multi-op work pieces. Increases spindle uptime on heavier work-pieces (up to 110 lbs.) by eliminating (or reducing) jib cranes and other loading equipment
For new and pre-existing CNC's
당사는 귀하의 경험을 개선하기 위해 쿠키를 사용합니다. 개인정보 보호정책.