Designed to load 2-3 CNC’s and/or secondary operations within an integrated cell for heavier multi-op work pieces. Increases spindle uptime on heavier work-pieces (up to 110 lbs.) by eliminating (or reducing) jib cranes and other loading equipment
For new and pre-existing CNC's
We use cookies to improve your experience. Privacy Policy.